Tres Picos

Construcción de nueva planta

Fabricación de las piezas de las torres, y supervisión durante pre-ensamblaje de los segmentos de torre e instalación de internos.

Hub height

120 meters

Wind turbine

AW125/3000

Number of towers

30 towers

Year of Construction

2019-2020

Tower Type

Full-Concrete Tower / Tower Design: NORDEX

Client

NORDEX WINDPOWER S.A.

Local Partnership

The precast concrete units were supplied in collaboration with PREAR, a well-known precast concrete company based in Mendoza.

This project required the construction of a new production facility in Bahía Blanca. Besides manufacturing the concrete units, the internal elements of the tower were also assembled on-site to achieve timely delivery.