Fabricación de los segmentos prefabricados.
Supervisión durante preensamblaje de los segmentos de torre.
Instalación de internos.
120 meters
Full-Concrete Tower / Tower Design: NORDEX
NORDEX ENERGY CHILE S.A.
These two wind farms located in northern La Araucanía are comprised of 89 precast concrete towers, all with a hub height of 120 meters. The 3 MW turbines were supplied by Nordex Energy.
The concrete units were manufactured by ‘Consortium VSL-Windtechnic SpA’, in a factory specifically built for this purpose, allowing a production rate of over 2.5 towers per week.
WINDTECHNIC also supervised the pre-assembly of the sections and the installation of the internal elements of the upper sections of the towers.
Our team of experts in engineering and construction of concrete towers is always ready to offer customized and sustainable solutions adapted to your needs.