Diseño y certificación de torres.
Diseño de cimentaciones.
Creación de manuales y procedimientos de fabricación y montaje.
Asesoramiento técnico durante fabricación y montaje de las torres. Asesoramiento técnico durante construcción de cimentaciones.
120 meters
Full-Concrete Tower / Tower Design: WINDTECHNIC
JINKE New Energy
In 2016, WINDTECHNIC designed and certified the 120-meter-high towers for the Goldwind GW115 and Haizhuang H111 turbines.
During the manufacturing and installation of the towers between 2016 and 2018, WINDTECHNIC performed technical consulting and supervision tasks.
The Hami wind farm has 200 towers with a “ring-type” or short -segment solution developed by WINDTECHNIC.
Our team of experts in engineering and construction of concrete towers is always ready to offer customized and sustainable solutions adapted to your needs.